Chapter – 16 FLOOR AND WALL FINISHES
16.1 Scope of Work
16.2 Applicable Standards
16.2.1 Pakistan Standards
16.2.2 ISO (International Organization for Standardization)
16.2.3 ASTM (American Society for Testing and Materials)
16.2.4 BSI (British Standards Institutions)
16.3 Material
16.3.1 Cement
16.3.2 Sand
16.3.3 Coarse Aggregates
16.3.4 Water
16.3.5 Ceramic Tiles
16.3.6 Terrazzo Tiles
16.3.7 Cleaning Compound
16.3.8 Vitrified Clay Tile
16.4 Cement Concrete Flooring
16.4.1 Composition of Concrete
16.4.2 Mixing Concrete
16.4.3 Construction
16.5 Installation of Tile Flooring
16.5.1 General
16.5.2 Terrazzo Tiles
16.5.3 Ceramic Tiles
16.5.4 Cement Concrete and Vitrified Tiles
16.6 Terrazzo Flooring Cast-in-Situ
16.6.1 Mix
16.6.2 Preparation for Terrazzo
16.6.3 Division Strips
16.6.4 Laying Terrazzo
Chapter – 17 PAINTING
17.1 Scope of Work
17.2 Applicable Standards
17.2.1 BSI (British Standards Institution)
17.3 General
17.4 Materials
17.5 Delivery Storage and Container Sizes
17.6 Surface Preparation
17.7 Application
17.8 Job Conditions
17.9 Quality Assurance
17.10 Measurement and Payment
17.10.1 Measurement
17.10.2 Payment
Chapter – 18 DAMP PROOF COURSE
18.1 Scope of Work
18.2 Horizontal
18.2.1 Walls
18.2.2 Floors
18.3 Vertical
18.4 Material Requirements
18.5 Construction Requirements
18.6 Measurement and Payment
18.6.1 Measurement
18.6.2 Payment
Chapter – 19 CLEARING AND GRUBBING
19.1 Scope
19.2 Construction Requirements
19.2.1 Grubbing
19.2.2 Clearing
19.2.3 Protection and Restoration
19.3 Measurement and Payment
Chapter – 20 CEMENT CONCRETE FLOORING
20.1 Scope of Work
20.2 General
20.3 Material Requirements
20.4 Base
20.5 Construction Requirements
20.5.1 Preparation of Base
20.5.1.1 Floor
20.5.1.2 Dado/Skirting
20.5.1.3 Panels
20.5.1.4 Mixing and Placing
20.6 Finishing
20.6.1 Concrete Floor (Smooth) with Topping
20.6.2 Concrete Floor (Roughened)
20.7 Curing
20.8 Measurement and Payment
20.8.1 Measurement
20.8.2 Payment
Monday, October 19, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment