Monday, October 19, 2009

8.11 Vapour Barrier
8.12 PVC Water Stop/Hydrofoil
8.12.1 Material
8.12.2 Placing & Connections
8.13 Measurement and Payment
8.13.1 Material
8.13.2 Basis of Payment

Chapter – 9 STRUCTURAL STEEL WORKS

9.1 Scope of Work
9.2 Drawings
9.3 Material
9.3.1 Structural Steel
9.3.2 Steel Forging
9.3.3 Steel Casting
9.3.4 Welding
9.3.5 High Strength Bolts
9.3.6 Washers
9.3.7 Cast Iron
9.4 Fabrication
9.4.1 Straightening of Material
9.4.2 Cutting
9.4.3 Holes Punching Drilling.
9.4.4 Welding
9.5 Surface Preparation / Painting
9.5.1 Surface Preparation
9.5.2 Painting
9.6 Inspection and Tests
9.7 Miscellaneous Steel Works
9.7.1 General
9.8 Measurement and Payment
9.8.1 Measurement
9.8.2 Payment

Chapter – 10 BRICK MASONRY

10.1 Scope of Work
10.2 Materials
10.3 Mortar
10.4 Brick
10.5 Placing
10.6 Curing and Repair
10.7 Scaffolding
10.8 Tolerances
10.9 Damp Proof Course
10.9.1 Walls – Horizontal Application
10.9.2 Walls – Vertical Application
10.9.3 Floors
10.10 Measurement and Payment
10.10.1 BrickWork
10.10.1.1 Measurement
10.10.1.2 Payment
10.10.2 Horizontal and Vertical Damp Proof Courses
10.10.2.1 Measurement
10.10.2.2 Payment

Chapter – 11 CARPENTRY AND JOINERY

11.1 Scope of Work
11.2 Applicable Standards
11.2.1 ISO (International Organization for Standardization)
11.2.2 BSI (British Standards Institution)
11.3 Materials
11.3.1 Timber
11.3.1.1 General Characteristics
11.3.1.2 Preservation of Wood
11.3.1.3 Adhesive
11.3.1.4 Nails and Screws
11.3.1.5 Ply Wood

No comments:

Post a Comment