3.1 Scope of Work
3.1.1 Setting Out
3.1.2 Cleaning
3.2 Authorized Outlines
3.3 Construction Requirements
3.3.1 Excavation in Foundations & Backfilling
3.3.1.1 Lines and Grades
3.3.1.2 Location for Placing of Excavated and Surplus Materials
3.3.1.3 Inspection of Foundations
3.3.1.4 Excavation to be kept Free of Water
3.3.1.5 Excess Excavation
3.3.1.6 Planking and Strutting
3.3.1.7 Classification of Material
3.3.1.8 Transportation of Materials
3.3.1.9 Termite Control
3.3.1.10 Compacted Fill and Backfill
3.4 Earth Filling Under Floors
3.4.1 Excavation of Works
3.5 Sand Filling Under Floor
3.6 Measurement and Payment
3.6.1 Excavation and Backfilling
3.6.1.1 Measurement
3.6.1.2 Payment
Chapter – 5 TERMITE CONTROL TREATMENT
5.1 Scope of Work
5.2 Material
5.3 Quality Assurance
5.4 Extent of Application
5.5 Standards
5.6 Samples and Tests
5.7 Guarantee
Chapter – 6 FORM WORK
6.1 Scope of Work
6.2 General
6.3 Materials
6.4 Delivery and Storage
6.5 Workmanship
Monday, October 19, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment